The Curtain Theatre, Shoreditch

The archaeological structure of the Shakespearian theatre was lightly vacuumed to remove surface dirt. Loose and unstable areas of brickwork and other materials were consolidated in situ with a sympathetic mortar. Sections requiring more stabilization were secured with helical bars, helical wall ties, stainless steel mesh and custom made stainless steel supports.